SOSheet SO-101 ◆ Solution / Safety & Regulatory Documentation
Published 2026-01-01·Updated 2026-02-20

Safety Documentation Aligned to Your Bid Requirements.

Halozen generates OSHA and EM 385-1-1 compliant JHAs, JSAs, and RAMS directly from extracted bid requirements — with proper regulatory citations for every hazard and control.

Sheet SO-102 ◆ Section 02 / Problem ↔ Solution3 pairs

What breaks today and what changes.

◆ Today's Pain
What teams hit on every bid
  • PS-01Safety teams copy-paste generic JHAs that don’t reflect actual project hazards, creating compliance gaps that surface during audits.
  • PS-02Manually writing JHAs with proper regulatory citations takes hours per activity and requires deep specialist knowledge.
  • PS-03Safety documentation created with generative AI tools hallucinate regulations and invent standard numbers that don’t exist.
◆ With Halozen
Cited, deterministic, audit-ready
  • PS-01Halozen generates project-specific JHAs from your bid and scope documents, mapping real tasks to relevant OSHA / EM 385-1-1 regulations.
  • PS-02Halozen maps each task to specific OSHA 1926 and EM 385-1-1 standards automatically, with proper citation formatting.
  • PS-03Halozen uses deterministic extraction from a verified regulatory database — every citation references a real, verifiable standard.
Sheet SO-103 ◆ Section 03 / Key Features4 entries
F-01Feature

OSHA / EM 385-1-1 Citation Mapping

Every hazard and control maps to specific OSHA 1926 or EM 385-1-1 standards with proper citation format.

F-02Feature

JHA / JSA / RAMS Generation

Generate Job Hazard Analyses, Job Safety Analyses, and Risk Assessment Method Statements from your actual scope documents.

F-03Feature

Bid-Specific Safety Alignment

Safety documents reflect your actual bid requirements — not generic templates — ensuring alignment from bid through execution.

F-04Feature

Field-Ready Formats

Toolbox talk cards, JHAs, and safety plans delivered in formats supervisors can use immediately on site.

Sheet SO-104 ◆ Section 04 / OutcomesMeasured deltas
0Hallucinated citations
95%+Citation accuracy
48hTypical delivery
3Regulatory frameworks
Sheet SO-105 ◆ Section 05 / How It Works4 stages
01

Upload Scope Documents

Submit your RFP, specification, or scope of work. Halozen identifies all safety-relevant construction tasks and activities.

02

Automated Regulatory Mapping

Halozen maps each task to relevant OSHA 1926 or EM 385-1-1 standards with specific hazards, controls, and PPE requirements.

03

Review Cited Safety Documents

Every JHA, JSA, and safety plan includes regulatory citations for verification. No invented standards — only real references.

04

Deploy to the Field

Export in field-ready formats for supervisor use, safety orientations, and regulatory submissions.

Sheet SO-106 ◆ Section 06 / FAQ4 entries
Q #Question+
Sheet SO-108 ◆ Section 08 / Related4 links
Built For
Sheet SO-109 ◆ Final / Try It on Your Spec48-hour outcome sprint

Send a real RFP. See what Halozen produces.

Audit-ready compliance outputs with 95%+ citation accuracy in 72 hours. No commitment required.

Talk to Our Team