Safety Documentation That’s Actually Project-Specific

Halozen generates JHAs, toolbox talks, and safety plans from your actual scope — with proper OSHA/WHS citations — so your safety program holds up to audit.

Challenges You Face

  • Generic Templates Don’t Reflect Real Hazards

    Copy-pasted JHAs from old projects miss scope-specific hazards and cite irrelevant standards. They’re compliance theater, not actual safety tools.

  • Regulatory Citation Is Time-Consuming

    Properly citing OSHA 1926, EM385, or WHS standards for every hazard and control takes hours per JHA — time safety managers don’t have.

  • Toolbox Talks Are Too Generic for the Field

    Field supervisors need project-specific safety information, not boilerplate handouts that don’t address actual site conditions.

  • Audit Readiness Is Always Reactive

    Safety documentation is scrambled together before audits instead of being audit-ready from day one.

What Halozen Delivers

0
Hallucinated Citations
Every OSHA/WHS citation references a real, verifiable standard — not machine-generated guesses.
72h
JHA Delivery
Project-specific JHAs with regulatory citations delivered in 72 hours.
3
Regulatory Frameworks
OSHA 1926, EM385-1-1, and WHS Regulations all supported natively.
95%+
Citation Accuracy
Every hazard, control, and PPE requirement is traced to its regulatory source.

Start a 72-Hour Outcome Sprint

Audit-ready compliance outputs delivered in 72 hours. No commitment beyond the sprint.

Frequently Asked Questions

How are JHAs generated from project scope?
Upload your RFP, specification, or scope of work. Halozen identifies construction tasks and activities, then maps each one to relevant regulatory standards with specific hazards, controls, and PPE requirements.
Why is deterministic extraction important for safety?
Generative AI can invent plausible but incorrect OSHA/WHS citations. In safety, a wrong citation is worse than no citation — it creates a false sense of compliance. Halozen only references verified, real standards.
Can I use these JHAs for regulatory submissions?
Yes. Every JHA includes properly formatted regulatory citations suitable for OSHA inspections, WHS audits, and regulatory submissions. The audit trail is built in from generation.

Send us a real RFP. See what Halozen produces.

Get audit-ready compliance outputs with 95%+ citation accuracy in 72 hours. No commitment required.

Talk to Our Team

No commitment required. See Halozen work on your documents.